A weekly look at the sites Poweral installs and manages. Each story covers one property: what it is, how many chargers we installed, the specific challenge the site threw at us and how our team solved it.
New stories are also shared every week on Poweral’s LinkedIn page.
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHandling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Read the storyDesigning Two Charging Sites for Two Parking Areas at an Office Building in Waterbury, CT
Instead of forcing every charger into one spot, we built two charging locations where drivers already park.
Read the storyBringing Vandalized Chargers Back Online at a Mixed-Use Property in Saddle Brook, NJ
A cracked cover left the chargers' router unplugged. We replaced it with a locking box and brought the site back online.
Read the storyPlanning 18 EV Chargers in the Snow at a 330-Unit Community in Auburn, NY
A winter site assessment, a hard-to-find transformer, and a utility engineer who happened to live on the property.
Read the storyGetting a Technician to a Damaged Charger Within Hours in Rockleigh, NJ
A driver severely damaged a charger. We rerouted a nearby technician and had someone on site within roughly three hours.
Read the storyProtecting New EV Chargers in Time for Reopening at a Retail Center in Burtonsville, MD
Midway through a rip and replace, we found no protective bollards around the chargers. We sourced them locally and still reopened on schedule.
Read the storyBuilding a Dedicated Charger Network at a New 527-Unit Community in Worcester, MA
The chargers were installed and powered but could not run properly without their own network connection. We built one.
Read the storyRedesigning an EV Charger Installation Around Existing Power in Mahwah, NJ
When the utility would not approve a new electrical service, we redesigned the project around the building's existing infrastructure.
Read the storySaving a Utility Rebate at a 124-Suite Hotel in Nanuet, NY
The utility inspector could only test half the chargers. We sent a technician with the right EV the next day, and the site passed.
Read the storyFixing Low Charger Use at a 352-Unit Condominium Community in Plainsboro, NJ
One charger sat underused because a gas car kept taking the spot. We worked with the property manager to fix it.
Read the storySolving a 208V to 120V Wiring Problem at an EDENS Retail Center in Irving, TX
A small transformer at the base of each pedestal avoided costly new underground wiring for the chargers' Wi-Fi router.
Read the storyReplacing Outdated EV Chargers at a 188-Room Hotel in Charlotte, NC
A full rip and replace, with custom pedestals shipped from New York to North Carolina on schedule.
Read the storyInstalling 24 EV Charging Ports Without Cutting Power to a Radio Broadcaster in Hartford, CT
A tenant that could never lose power meant redesigning the plan around a separate 400A panel.
Read the storyHave a property like one of these?