The site
The Courtyard by Marriott Charlotte Northlake is a 7-story hotel with 188 guest rooms and self-parking for guests. Poweral installed 6 Level 2 chargers using Tesla Universal Wall Connectors paired with branded cable management systems.
The challenge
This was not a standard installation. It was a complete rip and replace. The existing charging equipment had been poorly maintained and was no longer delivering the experience the property or its guests deserved.
The harder part was coordinating every moving piece across multiple states while keeping the project on schedule. Custom equipment had to move from our pedestal manufacturer in New York to the site in North Carolina, arrive at the right time and be ready for installation without delaying the project.
How we solved it
We removed the old hardware and replaced it with a modern, dependable solution built for long-term use.
From sourcing the hardware and managing production to coordinating freight and installation, we carried every step so the property ended up with a clean, reliable setup that looks right, works properly and is ready for guests.
Originally shared on LinkedIn as part of The Current, Week 2. View the post on LinkedIn.
More from The Current
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHandling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Read the story