The site
This 149-room hotel in Foxborough, MA sits near Gillette Stadium and Patriot Place, with shopping, dining and entertainment nearby. Poweral installed 8 Level 2 EV chargers.
The challenge
The hotel’s existing electrical service had no spare capacity available for a new EV panel. But the property had older DC fast chargers that had been out of use for some time, with a 480V supply already allocated to them.
How we solved it
We reused the existing 480V disconnects and added a step-down transformer to bring that supply to the voltage required by the new Level 2 chargers. This put the power previously allocated to the idle fast chargers to work for the charging setup the hotel preferred.
The solution was not about finding more power. It was about making use of the power already available on the property and adapting it to a different kind of charging.
That is the work Poweral carries from start to finish, so the site just works.
Originally shared on LinkedIn as part of The Current, Week 17. View the post on LinkedIn.
More from The Current
Handling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Read the storyDesigning Two Charging Sites for Two Parking Areas at an Office Building in Waterbury, CT
Instead of forcing every charger into one spot, we built two charging locations where drivers already park.
Read the story