The site
MacArthur Park Retail Center is an EDENS shopping destination in Irving, TX. It holds close to 60 stores and nearly 2,000 parking spaces.
Poweral was brought in to upgrade the EV charging area with brand new Tesla Universal Wall Connectors and a high-end cable management system.
The challenge
The existing charging infrastructure was outdated and unmaintained, so this was a full rip and replace project.
The real puzzle came when the team needed to install an outlet for the Wi-Fi router. The site’s wiring ran on 208V, but the outlet required a 120V line, and running a new electrical line underground would have been costly and disruptive.
How we solved it
Poweral’s infrastructure team worked with its electrical engineers to design a fix: a small transformer sits at the base of each pedestal, converting the available current to exactly what the outlet needs.
That is the work we do, carrying every step from old wiring to the last detail so the site just runs.
Originally shared on LinkedIn as part of The Current, Week 3. View the post on LinkedIn.
More from The Current
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHandling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.