
The site
Standart Woods is a 330-unit multifamily community in Auburn, NY, set across 20 acres with a pool, a clubhouse and on-site laundry facilities. The property has 3 separate charging sites with 6 chargers each, for 18 EV chargers in total.
The challenge
We first visited Standart Woods for a site assessment in the dead of winter. Snow covered much of the property, and one of the transformers we needed to evaluate was hard to locate and access.
How we solved it
Our electrician was on the phone with an engineer from the local utility, working through potential transformer locations and the best way to serve the property. Then came the coincidence: the utility engineer happened to live at Standart Woods. He knew the property firsthand and helped us identify the infrastructure and work through the site layout in real time.
What could have turned into a second site visit became a solution on the spot.
That is what Poweral does, carrying every step so the site just works.
Originally shared on LinkedIn as part of The Current, Week 10. View the post on LinkedIn.
More from The Current
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHandling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Read the story

