The site
This is an 11-story, multi-tenant office building in Hartford, CT, with nearly a quarter-million square feet of office space. It is home to approximately 30 businesses and organizations and has 570 on-site parking spaces.
Poweral installed 24 public Level 2 charging ports across 5 locations throughout the parking lots.
The challenge
Our original plan was to draw power from the main distribution cabinet and deploy the EV charger sub panels from there. That work required a power shutdown, which is usually scheduled after hours.
But one of the tenants, iHeartRadio, is a radio broadcaster that could not have a shutdown at any time.
How we solved it
We changed the scope and redesigned the plan to come off a 400A panel that was not feeding the broadcaster’s power. The broadcaster never lost power, not even for the brief moment it takes to add our equipment to the supply.
This is the work Poweral carries from start to finish, solving the hard parts along the way so the site just works.
Originally shared on LinkedIn as part of The Current, Week 1. View the post on LinkedIn.
More from The Current
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHandling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Read the story