The site
This is a 90,000-square-foot, three-story office building in Mahwah, NJ. It is home to a diverse mix of businesses and supported by nearly 400 parking spaces. Poweral installed 12 Autel chargers.
The challenge
The original plan was to bring in a new dedicated electrical service for the chargers. Once we got into the project, we hit a major roadblock: the utility would not approve a new service at the property.
How we solved it
Rather than let that stop the project, we went back to the drawing board and redesigned the installation around the building’s existing electrical infrastructure.
It was not the easiest path, and a dedicated service may have been the cleaner long-term solution. But waiting for the perfect solution could have meant the chargers never got installed.
When the plan changes, we adapt and keep moving, because our job is to get the site working no matter what stands in the way.
Originally shared on LinkedIn as part of The Current, Week 6. View the post on LinkedIn.
More from The Current
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHandling Contaminated Soil During an EV Charger Installation in Washington, NJ
Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Read the story