Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel

With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel’s new Level 2 chargers.
Handling Contaminated Soil During an EV Charger Installation in Washington, NJ

Soil along the trench route turned out to be contaminated. We brought in a specialized environmental company and kept the project moving.
Helping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ

With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Designing Two Charging Sites for Two Parking Areas at an Office Building in Waterbury, CT

Instead of forcing every charger into one spot, we built two charging locations where drivers already park.
Bringing Vandalized Chargers Back Online at a Mixed-Use Property in Saddle Brook, NJ

A cracked cover left the chargers’ router unplugged. We replaced it with a locking box and brought the site back online.
Planning 18 EV Chargers in the Snow at a 330-Unit Community in Auburn, NY

A winter site assessment, a hard-to-find transformer, and a utility engineer who happened to live on the property.
Getting a Technician to a Damaged Charger Within Hours in Rockleigh, NJ

A driver severely damaged a charger. We rerouted a nearby technician and had someone on site within roughly three hours.
Protecting New EV Chargers in Time for Reopening at a Retail Center in Burtonsville, MD

Midway through a rip and replace, we found no protective bollards around the chargers. We sourced them locally and still reopened on schedule.
Building a Dedicated Charger Network at a New 527-Unit Community in Worcester, MA

The chargers were installed and powered but could not run properly without their own network connection. We built one.
Redesigning an EV Charger Installation Around Existing Power in Mahwah, NJ

When the utility would not approve a new electrical service, we redesigned the project around the building’s existing infrastructure.