The site
This 109-unit apartment community in Washington, NJ occupies a former silk mill, bringing residential living to a property with an industrial past. Poweral installed 8 EV chargers.
The challenge
We were ready to schedule construction when we learned that the soil along the proposed trench route was contaminated. The trench was part of the installation, but handling the soil required a different kind of coordination.
How we solved it
We worked with a specialized environmental company and arranged for them to pick up the soil removed during excavation. We then refilled the trench with clean, approved soil.
The chargers are the part people see, but the work below ground matters too. At this property, carrying the project meant coordinating beyond the electrical installation and making soil removal and replacement part of the plan.
That is the work Poweral carries from start to finish, so the site just works.
Originally shared on LinkedIn as part of The Current, Week 16. View the post on LinkedIn.
More from The Current
Reusing Idle Fast-Charger Power for 8 Level 2 Chargers at a Foxborough, MA Hotel
With no spare electrical capacity, we put the power from out-of-use DC fast chargers to work for the hotel's new Level 2 chargers.
Read the storyHelping Drivers Find the Chargers in a 1,500-Space Lot in Paramus, NJ
With parking wrapped around both sides of a large office building, wayfinding was the whole challenge.
Read the storyDesigning Two Charging Sites for Two Parking Areas at an Office Building in Waterbury, CT
Instead of forcing every charger into one spot, we built two charging locations where drivers already park.
Read the story