Quick takeaway

Level 2 chargers fit fleets that park overnight or for several hours. DC fast chargers fit high-turnover depots where vehicles need a quick charge between routes. Most fleet sites end up using one type or a mix of both, decided during a site assessment.

Why fleet charging decisions are different

For home or workplace charging, the question is simple: how long does the car sit before someone needs it again? A fleet depot asks a harder version of the same question. Vehicles don’t just sit, they run routes, come back, and sometimes go back out again the same day. The deciding factor isn’t how long a vehicle is parked overnight. It’s how long it’s parked between the moment it returns and the moment it needs to leave again.

Level 2 chargers, best for overnight or long-dwell parking

Level 2 chargers run on 208 to 240-volt power and typically deliver 7 to 19 kilowatts per port, adding somewhere around 10 to 40 miles of range per hour depending on the vehicle and the charger. A fleet vehicle parked overnight, or for a full shift, can go from low battery to full in that window without needing anything faster. Level 2 hardware and installation also cost significantly less than DC fast equipment, which adds up fast on a depot that needs a dozen ports instead of one or two.

DC fast chargers, best for high-turnover depots and quick routes

DC fast chargers deliver 50 to 350 kilowatts and can bring a vehicle to 80 percent charge in 20 minutes to an hour, depending on the vehicle’s battery and how much power it can accept. That 80 percent figure matters: charging speed on any DC fast charger tapers substantially past that point to protect the battery, so planning around an 80 percent target is more realistic than assuming a full charge in the same window.

That speed costs more. DC fast hardware, installation, and the electrical service needed to support it all run higher than Level 2. It earns its keep on depots where vehicles are back out within an hour or two of returning, delivery vans on tight schedules, or vehicles shared across shifts.

Connector standards: NACS vs. CCS1

This affects the hardware decision as much as power output does. NACS, the connector Tesla originally developed, has become the standard most automakers are now building into new vehicles. CCS1 hasn’t gone away, though, and it’s still what most of the non-Tesla EVs already on the road use.

A charger built for only one standard turns away whichever half of the fleet doesn’t use it, unless drivers carry adapters, and adapters aren’t rated for the kind of daily, continuous duty cycle a fleet depot puts a charger through. Poweral installs multi-standard hardware, equipment with both NACS and CCS1 built in, as the default for fleet sites, so the connector question doesn’t turn into a second installation project down the line.

How we decide which fits your site

The site assessment looks at fleet size, dwell time, and existing electrical capacity, then recommends a charger mix, which is often not all one type. That recommendation feeds directly into the same process described on the pillar page.

Mixed deployments, when a site needs both

Plenty of depots land on a mix: Level 2 for vehicles that sit overnight, DC fast for the smaller number that need a fast turnaround mid-shift. Planning for both from the start, even if only Level 2 gets installed first, avoids a second, more disruptive electrical project later. The infrastructure guide covers what that kind of expansion-ready planning actually involves on the electrical side.

Frequently asked questions

Can one property have both Level 2 and DC fast chargers?

Yes, and it’s common on larger fleet depots. The site assessment determines the right mix based on how the fleet actually uses the property, not a fixed formula.

Does the charger type change who pays or who owns them?

No. Poweral’s cost model works the same regardless of charger type: installation is typically free to the property owner, funded through rebates, and the owner keeps the chargers either way. The full breakdown of costs and ownership covers this in more detail.

Do I need to pick NACS or CCS1 chargers, or can I get both?

Both, and for a fleet site that’s the recommended approach. Multi-standard equipment costs more upfront than a single-connector charger, but it avoids turning away part of the fleet traffic the installation was meant to serve.

How much slower does charging get past 80 percent?

Meaningfully slower, on any DC fast charger. That’s a battery protection feature, not a hardware limitation Poweral can configure around, which is why fleet charging plans are typically built around an 80 percent target rather than a full charge.

Next step

Start with a site assessment to see which charger type, or mix, fits your property. Read the EV Fleet Charging Solutions for Commercial Properties or see the installation service for what happens after that.

JJ

Written by

Jay Jaffa

President & COO, Poweral

Jay Jaffa is President and COO of Poweral, where he oversees day-to-day operations and the team managing EV charging installations across Poweral's service areas. He came to Poweral with a background in e-commerce and has helped grow the company from its first property to hundreds of installations.

Meet the full Poweral team

Share: