Quick takeaway
Installation is typically free to the property owner, covered by state and utility rebates rather than your budget. You keep the chargers. Poweral manages the charging operation in exchange for a share of the revenue it generates.
The short answer
Installation is typically free to the property owner.
How that’s possible
For years, commercial charging projects could offset some of the cost with Section 30C, a federal tax credit for properties in eligible census tracts. It covered up to 30 percent of equipment and installation costs, capped at 100,000 dollars per port. That credit expired at the end of June 2026.
Today, the funding comes almost entirely from state and utility rebate programs instead, and where they exist, those programs are often substantial. New Jersey runs several at once: utility rebates through PSE&G, JCP&L, and Atlantic City Electric, the state’s Clean Fleet EV Incentive Program, and the EV Tourism Corridor Program, which covers a set dollar amount per port for qualifying properties. California’s version includes SCE’s Charge Ready program, SMUD’s commercial rebate, and the state-run Fast Charge California initiative, which can cover a significant share of project costs for DC fast installations. Every state Poweral serves has its own mix of these programs, and the details, eligibility, dollar caps, application windows, change often enough that keeping track of them is close to a full-time job.
Poweral tracks them and applies on the property owner’s behalf through grant and rebate application assistance, which is how installation ends up costing the owner nothing in most cases.
Who owns the chargers after installation
The property owner does. Ownership doesn’t revert to Poweral or to whichever fleet operator uses the chargers. Once installed, they stay with the property, the same way any other fixed improvement would.
How the revenue share works
Poweral operates and maintains the charging equipment in exchange for a share of what fleet vehicles pay to charge there. The exact split depends on details specific to the site, charger count and expected usage among them, and gets worked out during the proposal stage rather than set as a flat rate across every property. The proposal also lays out which rebate programs the site qualifies for, so the property owner sees the full financial picture before agreeing to anything.
What logistics and distribution property owners should know
Logistics and distribution sites tend to have concentrated, predictable dwell time: trucks returning at set times, parked overnight in the same spots. That pattern is exactly what makes fleet charging work financially. The charging program runs on space that’s already committed to parking, without changing how the property operates day to day, and the predictability of that traffic is also what makes these sites attractive to utility rebate programs in the first place.
How the incentive process actually works
Property owners don’t file for these programs themselves. During the proposal stage, Poweral identifies which state and utility incentives the property qualifies for based on its location and the utility territory it sits in, then handles the applications directly. Timelines vary: some utility rebates are approved in weeks, while state programs with funding rounds, like New Jersey’s RGGI Medium and Heavy Duty program, run on application windows and limited budgets. That timing gets factored into the project schedule from the start rather than surfacing as a surprise later.
Frequently asked questions
Do I own the chargers, or does Poweral?
You do. The chargers stay with the property whether or not Poweral continues to manage the charging operation.
What happens if I sell the property?
That depends on the terms of the agreement in place at the time, which is worth reviewing before a sale rather than after. Poweral can walk through what that looks like for your specific property.
Are there incentives specific to fleet charging?
Some state and utility programs offer higher incentives for fleet and medium or heavy-duty charging specifically, since utilities see fleet depots as a concentrated, predictable source of new electricity demand. Which programs apply depends on the property’s location and utility territory.
How long does it take to get through the rebate application process?
It varies by program. Utility rebates often move in a matter of weeks. State programs with fixed funding rounds can take longer, and some only accept applications during specific windows, which is why Poweral starts the incentive research early in the proposal stage rather than after the site assessment.
Is the revenue share the same for every property?
No. It’s set per site based on charger count, expected usage, and other specifics of the property, and it’s laid out clearly in the proposal before any agreement is signed.
Next step
See the full picture of how fleet charging works on the EV Fleet Charging Solutions for Commercial Properties guide, or get in touch to start a site assessment.